Sunday, June 17, 2018

Sheetrock on the hallway side is done. Wiring inside the new wall is nearly finished also.  We need to add a two studs in the wall to create a door jamb for the Dutch door at the end of the hallway, then the inside of the wall can be drywalled.







Tuesday, June 12, 2018

Short day this past Sunday, but me and Rob had other plans.  We finished the subfloors and finished the wall between the dining room and the hall including the doorway/header.





We also got the sheetrock in and hung a few in the hallway.
I'll take photos next week when we get the mud & tape on it.


Monday, June 4, 2018

This weekend Rob and I finished the subfloor except for 2 pieces that need custom fitting around the cast iron radiator pipes, and we completed the dining room wall except for the header over the doorway.

We then sprayed 5 gallons of mold/mildew inhibiting primer on all the new construction to protect it.  We sprayed in the basement as well as the first floor.  As there is no functioning HVAC in the house yet, it gets quite hot & sticky in the summer months.  So we thought it would be best to err on the side of caution.

In the basement:

In the dining room:

In the hallway:

Check out this before(2016) and after shot:


I'm pretty sure that we're ready for drywall now.