Sunday, May 20, 2018

3/4" tongue and groove plywood subfloor is going down throughout the kitchen, hallway, and dining room.


Sunday, May 6, 2018

Today Rob and I removed all of the floor joists except the two nearest the exterior wall.  We then installed all new 2X8 joists throughout the hallway and dining room.
 
     Next week the plywood subfloor should start going in.

f



Ok, I got a new computer which is twice as fast as the old one and pictures now load in seconds rather than hours.

So let me get this blog caught up to current.  Two weeks ago My buddy Junior went up and helped me demo the dining room. We removed two walls and what was left of the hardwood floor(it was actually quite soft). We nearly filled an 18 yard dumpster with all the wood, plaster, lap, and sheetrock.



We had a little room left in the dumpster so we emptied all the clutter out of the master bedroom and gave it a good sweeping.  The floors are in real good condition but they do need to be mopped.



g



Thursday, May 3, 2018

Still waiting on the new computer, but I was able to get two photos to upload (each one took 7 hrs to load).

Here is a good view of the dining room with all the floor removed. I have planks laid across the joists in order to get around.
.

And here is a pic of the load bearing 2X8's all the way down in the basement.  They are 18 feet long and are holding up the dining room ceiling while the walls are down.


Monday, April 30, 2018

Mini update:   Work has been progressing, but computer issues have hindered updates.  New PC is on its way, and with it will be updates with photos.

In the meantime, here's one photo of the dining room.  The floors are all gone except for the joists, and the wall between it and the hallway is gone also.  Three temporary load bearing 2X8's are holding up the ceiling from all the way down in the basement.

 

Tuesday, April 17, 2018

This past Sunday, Rob and I removed/burned all of the debris and wood from the garage demo. We filled about half of the dumpster, which is good because we have room leftover for the debris from the dining room wall which will be torn down this coming week.

Once there was no longer any evidence that a garage had ever been there, we moved on to the kitchen floor.   We installed new floor joists which were attached via joist hangars to the new
quadruple 2 X 10 beam that we installed the summer before last.

On the other end the joists rest on the new poured concrete foundation.  We started putting down the new 3/4" tongue & groove subfloor,  but the batteries in the camera died. I'll try to get photos next week.

The first Joist installed:

Yes I know, the wainscoting is shot. It will be replaced after the floor is done.


Sunday, April 8, 2018


Mother Nature has been cruel and heartless this year, as spring has yet to be sprung.
Snowstorms and temperatures below freezing have delayed any work. That is, until today.

Today it was 39 F , but we had to accomplish something.  So, we contemplated fixing the roof on the garage.  That was, until we emptied it out and realized it was too far gone.  The roof had caved in,  the overhead door was trash, and the two  interior stone walls were falling in.

Judging by the dimension and color of the lumber used, the garage was likely built in the 1950's or 60's.   It was not original to the house, so the decision was made to demolish it.

Last photo before the demo:
   

 Here is a video of me pulling it down with the truck:



 

We also completely demoed the kitchen floor including the rotted floor joists today.
New joists and 3/4" tongue & groove plywood subfloor begins next week.