I forgot the camera today, but Rob managed to snap a blurry cell phone photo of the new dining/hallway wall that got built today.
The temporary wall will come down next week so that the last of the plywood subfloor can be installed.
I'm going to buy the sheetrock this week, so that should be exciting! Stay tuned.
Sunday, May 27, 2018
Sunday, May 20, 2018
Sunday, May 6, 2018
Ok, I got a new computer which is twice as fast as the old one and pictures now load in seconds rather than hours.
So let me get this blog caught up to current. Two weeks ago My buddy Junior went up and helped me demo the dining room. We removed two walls and what was left of the hardwood floor(it was actually quite soft). We nearly filled an 18 yard dumpster with all the wood, plaster, lap, and sheetrock.
We had a little room left in the dumpster so we emptied all the clutter out of the master bedroom and gave it a good sweeping. The floors are in real good condition but they do need to be mopped.
g
So let me get this blog caught up to current. Two weeks ago My buddy Junior went up and helped me demo the dining room. We removed two walls and what was left of the hardwood floor(it was actually quite soft). We nearly filled an 18 yard dumpster with all the wood, plaster, lap, and sheetrock.
We had a little room left in the dumpster so we emptied all the clutter out of the master bedroom and gave it a good sweeping. The floors are in real good condition but they do need to be mopped.
g
Thursday, May 3, 2018
Still waiting on the new computer, but I was able to get two photos to upload (each one took 7 hrs to load).
Here is a good view of the dining room with all the floor removed. I have planks laid across the joists in order to get around.
.
And here is a pic of the load bearing 2X8's all the way down in the basement. They are 18 feet long and are holding up the dining room ceiling while the walls are down.
Here is a good view of the dining room with all the floor removed. I have planks laid across the joists in order to get around.
.
And here is a pic of the load bearing 2X8's all the way down in the basement. They are 18 feet long and are holding up the dining room ceiling while the walls are down.
Monday, April 30, 2018
Mini update: Work has been progressing, but computer issues have hindered updates. New PC is on its way, and with it will be updates with photos.
In the meantime, here's one photo of the dining room. The floors are all gone except for the joists, and the wall between it and the hallway is gone also. Three temporary load bearing 2X8's are holding up the ceiling from all the way down in the basement.
In the meantime, here's one photo of the dining room. The floors are all gone except for the joists, and the wall between it and the hallway is gone also. Three temporary load bearing 2X8's are holding up the ceiling from all the way down in the basement.
Tuesday, April 17, 2018
This past Sunday, Rob and I removed/burned all of the debris and wood from the garage demo. We filled about half of the dumpster, which is good because we have room leftover for the debris from the dining room wall which will be torn down this coming week.
Once there was no longer any evidence that a garage had ever been there, we moved on to the kitchen floor. We installed new floor joists which were attached via joist hangars to the new
quadruple 2 X 10 beam that we installed the summer before last.
On the other end the joists rest on the new poured concrete foundation. We started putting down the new 3/4" tongue & groove subfloor, but the batteries in the camera died. I'll try to get photos next week.
The first Joist installed:
Yes I know, the wainscoting is shot. It will be replaced after the floor is done.
Once there was no longer any evidence that a garage had ever been there, we moved on to the kitchen floor. We installed new floor joists which were attached via joist hangars to the new
quadruple 2 X 10 beam that we installed the summer before last.
On the other end the joists rest on the new poured concrete foundation. We started putting down the new 3/4" tongue & groove subfloor, but the batteries in the camera died. I'll try to get photos next week.
The first Joist installed:
Yes I know, the wainscoting is shot. It will be replaced after the floor is done.