We got a little more progress on the joists / subfloor, and rear wall. Should have that all done next weekend then I'll have to run the new electrical outlets & switches. Rob should be hanging the drywall the following week.
Rob applying the construction adhesive for the subfloor:
No comments:
Post a Comment