I also started removing and disassembling some of the black pipe that fed the cast iron radiators in the house. We will be splitting the two floors into two separate heating zones. I also bought a pipe vise, a cutter and a threader for up to 2" steel pipe. I got it all on craigslist for under $200
Lastly, I got the first order of parts in for the boiler. More stuff is on the way:
No comments:
Post a Comment