Saturday, May 30, 2020

Filling the Gaps (grout time)

The slate floor is done, Rob filled all the gaps with natural grey sanded grout today. The only thing that remains to be done is an application of sealer after 72 hours of cure time, and install the baseboard moulding down both sides of the hall.  The gray color of the grout will dry to a much lighter shade, but here are the pictures of the completed floor today.
 


    While Rob was grouting, I installed a bit more plywood on the kitchen floor and installed the last outlet box on the south kitchen wall.  After that, we joined forces and finished the wainscoting and baseboard moulding on that same south wall.  Only the chair rail moulding remains in the kitchen, then the vinyl flooring can be laid down.



update (6-6-2020)
   Chair rail done, and slate/grout has been sealed.
   