Monday, August 31, 2020

Electric panel swap out (part 1)

      Today I began running the new electric service cable, I wired the kitchen, dining room, and well pump circuits up to the new panel,  and I installed the service disconnect switch.  Matt is definitely coming up this weekend to swap in the new cable to the meter.
   




      I also finished trimming the windows in the library(see post below) and got all the hardwood for the floor into the dining room loaded into the house.